Abstract

The construction industry is considered an essential element to stabilize countries economically. In the UAE, this sector has received a lot of attention and development since the discovery of oil. This has enhanced the continuous expansion in construction activities. Recently, the construction projects in the UAE and KSA together reached 60% of the whole projects in the Middle East region, and the majority of it was in Dubai, which in 2018 enhanced its Gross Domestic Product (GDP) to reach 14.5%. Therefore, the decision-makers apply multiple methods at different projects in order to achieve the prime factors for project success which are: cost, time, quality, and safety. However, there are different variables and unpredictable causes that are faced by the construction industry, such as the availability of the main resources, different environmental conditions, financial issues, political conditions, poor productivity, and contractual relations. Meanwhile, there is a great interest in delivering residential construction projects to cover the demand of shelter on time and within the estimated cost limits, and most importantly with the required quality, taking into account all that variables.

This research aims to shed light on two of the construction management constraints which are the project’s cost and time. The author of this thesis focuses on two main objectives. First, exploring and understanding the contributing factors of cost escalation and schedule delay in the residential construction projects in the UAE. Secondly, ranking the factors according to their impacts and risk ratio on projects, which are based on the viewpoint of respondents. A Mixed-method approach was used in this study, starting with the exploratory sequential design to feed the first objective of the study, by using a simple thematic approach to analyze the qualitative data. The author applied this study during 2020 and 2021 by conducting semistructured interviews with thirty construction project managers in the UAE, whose experience range between 5 and 20 years. Followed by the analytical quantitative stage by using the Relative Importance Index (RII) technique on the most frequent factors that were affecting the project’s cost and time from the literature review. The same participants rank these factors by conducting a 7-point Likert scale.

The study highlighted some factors that lead to mismatching between the estimated and actual cost and time specified in the residential construction projects, as it has shed light on the most significant causes factors such as poor coordination between the staff, lack of contractors experience, delays in materials delivery, contractor’s payment delay, complex surrounding of the site, estimation errors, lack of consultants experience, requirements changes by the client, client’s payment delay, fluctuation of material’s price, labor and equipment availability, unskilled labor, manufacture issues, authority regulations, and Covid-19.

This study contributes to adding further data and growing the literature on construction management in the UAE. This research has opened the door for several future studies on the local level to take the necessary procedures that mitigate the impacts of these factors and thus increase the expansion of the construction industry and productivity to serve the stakeholders.

Comments

تعتبر صناعة البناء عنصرا أساسیا لتحقیق الاستقرار الاقتصادي للدول. وقد حظي ھذا القطاع باھتمام وتطور كبیر منذ اكتشاف النفط حتى الوقت الحاضر حیث یوجد توسع مستمر في أنشطة البناء ومؤخرا في الإمارات وحدھا وصل إلى 60 ٪ والغالبیة في دبي. وھذا یعزز الناتج المحلي الإجمالي لدبي لیبلغ 14.5 ٪ في 2018 . لذلك یطبق صناع القرار طرقاً متعددة في مشاریع مختلفة من أجل تحقیق العوامل الرئیسیة لنجاح المشروع وھي: التكلفة والوقت والجودة والسلامة. ومع ذلك ھناك متغیرات مختلفة وأسباب غیر متوقعة واجھت صناعة البناء والتشیید ، مثل توافر الموارد الرئیسیة والظروف البیئیة المختلفة والقضایا المالیة والظروف السیاسیة وضعف الإنتاجیة والعلاقات التعاقدیة. في الوقت نفسھ ھناك اھتمام كبیر بإنجاز المشاریع الإنشائیة السكنیة لتغطیة الطلب على المأوى في الوقت المحدد وضمن حدود التكلفة التقدیریة والأھم بالجودة المطلوبة مع مراعاة كل تلك المتغیرات.

الھدف من ھذا البحث ھو إلقاء الضوء على اثنین من قیود إدارة البناء وھما تكلفة المشروع ووقتھ مع التركیز على ھدفین رئیسیین أولا استكشاف وفھم العوامل المساھمة في تصعید التكلفة والتأخیر الزمني في مشاریع البناء السكنیة في الإمارات وثانیاً ترتیبھا وفقاً لتأثیراتھا ونسبة المخاطر على المشاریع التي تستند إلى وجھة نظر المستجیبین. تم استخدام نھج الطریقة المختلطة في ھذه الدراسة باتباع التصمیم التسلسلي الاستكشافي من أجل تغذیة الھدف الأول من الدراسة. أجرى المؤلف ھذه الدراسة خلال عامي 2020 و 2021 من خلال إجراء مقابلات شبھ منظمة مع ثلاثین من مدیري مشاریع البناء في الإمارات العربیة المتحدة. الذین تراوح متوسط خبرتھم بین 5 و 20 سنة باستخدام نھج مواضیعي بسیط لتحلیل البیانات النوعیة. تلیھا المرحلة الكمیة التحلیلیة باستخدام تقنیة مؤشر الأھمیة النسبیة (RII) لتحلیل البیانات التي تم جمعھا من نفس المشاركین من أجل تقییم وترتیب عوامل التحقیق حسب الأھمیة.

أبرزت الدراسة بعض العوامل التي تؤدي إلى عدم التوافق بین التكلفة التقدیریة والفعلیة والوقت المحدد في مشاریع البناء السكني حیث سلطت الضوء على أھم الأسباب مثل ضعف التنسیق بین الموظفین وقلة خبرة المقاولین والتأخیر في تسلیم المواد و تأخر سداد المقاول و الموقع الجغرافي للمشروع و أخطاء التقدیر نقص خبرة الاستشاریین و تغییرات المتطلبات من قبل العمیل و تأخیر دفع العمیل و تقلب أسعار المواد و توافر العمالة والمعدات و العمالة غیر الماھرة و قضایا التصنیع و لوائح السلطة و و جائحة كورونا.

تساھم ھذه الدراسة في إضافة المزید من البیانات وزیادة الأدبیات حول إدارة البناء في دولة الإمارات العربیة المتحدة. لقد فتح ھذا البحث الباب أمام العدید من الدراسات المستقبلیة على المستوى المحلي لاتخاذ الإجراءات اللازمة التي تخفف من آثار ھذه العوامل وبالتالي زیادة التوسع في صناعة البناء والإنتاجیة لخدمة أصحاب المصلحة.